Estimation of Bank Erosion Due to Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
DOI : DOI: 10.5614/itbj.eng.sci.2009.41.2.5
Date : 13 September 2013
SedimentationÃÂ isÃÂ suchÃÂ aÃÂ crucialÃÂ issueÃÂ toÃÂ beÃÂ notedÃÂ onceÃÂ the accumulatedÃÂ sedimentÃÂ beginsÃÂ toÃÂ fillÃÂ theÃÂ reservoirÃÂ deadÃÂ storage,ÃÂ thisÃÂ willÃÂ then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir managementÃÂ ofÃÂ activities.ÃÂ TheÃÂ continuousÃÂ inflowÃÂ ofÃÂ sedimentÃÂ toÃÂ theÃÂ reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the usefulÃÂ ageÃÂ ofÃÂ reservoir.ÃÂ BecauseÃÂ ofÃÂ that,ÃÂ theÃÂ rateÃÂ ofÃÂ theÃÂ sedimentÃÂ needsÃÂ toÃÂ be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. ThisÃÂ effortÃÂ canÃÂ beÃÂ performedÃÂ through;ÃÂ theÃÂ regulationÃÂ ofÃÂ fluctuatingÃÂ rateÃÂ of reservoir surface current that does not cause suddenlyÃÂ drawdownÃÂ and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP). TheÃÂ rateÃÂ ofÃÂ bankÃÂ erosionÃÂ forÃÂ theÃÂ reservoirÃÂ variatesÃÂ fromÃÂ 0.0009ÃÂ toÃÂ 0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.MeanÃÂ whileÃÂ theÃÂ ÃÂ rateÃÂ ofÃÂ watershedÃÂ sedimentÃÂ hasÃÂ aÃÂ significantÃÂ value,ÃÂ i.e:ÃÂ 3,02 ÃÂ MCM/yearÃÂ forÃÂ SagulingÃÂ thatÃÂ causesÃÂ toÃÂ fullfillÃÂ theÃÂ storageÃÂ capacityÃÂ inÃÂ 40ÃÂ next years (from years 2008).ÃÂ