Estimation of Bank Erosion Due to Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
DOI : DOI: 10.5614/itbj.eng.sci.2009.41.2.5
Date : 13 September 2013
SedimentationÃÂÃÂ isÃÂÃÂ suchÃÂÃÂ aÃÂÃÂ crucialÃÂÃÂ issueÃÂÃÂ toÃÂÃÂ beÃÂÃÂ notedÃÂÃÂ onceÃÂÃÂ the accumulatedÃÂÃÂ sedimentÃÂÃÂ beginsÃÂÃÂ toÃÂÃÂ fillÃÂÃÂ theÃÂÃÂ reservoirÃÂÃÂ deadÃÂÃÂ storage,ÃÂÃÂ thisÃÂÃÂ willÃÂÃÂ then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir managementÃÂÃÂ ofÃÂÃÂ activities.ÃÂÃÂ TheÃÂÃÂ continuousÃÂÃÂ inflowÃÂÃÂ ofÃÂÃÂ sedimentÃÂÃÂ toÃÂÃÂ theÃÂÃÂ reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the usefulÃÂÃÂ ageÃÂÃÂ ofÃÂÃÂ reservoir.ÃÂÃÂ BecauseÃÂÃÂ ofÃÂÃÂ that,ÃÂÃÂ theÃÂÃÂ rateÃÂÃÂ ofÃÂÃÂ theÃÂÃÂ sedimentÃÂÃÂ needsÃÂÃÂ toÃÂÃÂ be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. ThisÃÂÃÂ effortÃÂÃÂ canÃÂÃÂ beÃÂÃÂ performedÃÂÃÂ through;ÃÂÃÂ theÃÂÃÂ regulationÃÂÃÂ ofÃÂÃÂ fluctuatingÃÂÃÂ rateÃÂÃÂ of reservoir surface current that does not cause suddenlyÃÂÃÂ drawdownÃÂÃÂ and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP). TheÃÂÃÂ rateÃÂÃÂ ofÃÂÃÂ bankÃÂÃÂ erosionÃÂÃÂ forÃÂÃÂ theÃÂÃÂ reservoirÃÂÃÂ variatesÃÂÃÂ fromÃÂÃÂ 0.0009ÃÂÃÂ toÃÂÃÂ 0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.MeanÃÂÃÂ whileÃÂÃÂ theÃÂÃÂ ÃÂÃÂ rateÃÂÃÂ ofÃÂÃÂ watershedÃÂÃÂ sedimentÃÂÃÂ hasÃÂÃÂ aÃÂÃÂ significantÃÂÃÂ value,ÃÂÃÂ i.e:ÃÂÃÂ 3,02 ÃÂÃÂ MCM/yearÃÂÃÂ forÃÂÃÂ SagulingÃÂÃÂ thatÃÂÃÂ causesÃÂÃÂ toÃÂÃÂ fullfillÃÂÃÂ theÃÂÃÂ storageÃÂÃÂ capacityÃÂÃÂ inÃÂÃÂ 40ÃÂÃÂ next years (from years 2008).ÃÂÃÂ