Dr FACHRURRAZI, S.T, M.T
S1 - Teknik Sipil




SINTA Score Overall
394
SINTA Score 3Year
40
Affiliation Score Overall
2.250.040
Affiliation Score 3Year
2.250.040
Authors Publication
Database Author
Scopus | WOS | Garuda | GS | |
---|---|---|---|---|
Article | 11 | 0 | 0 | 28 |
Citation | 78 | 0 | 0 | 181 |
Cited Document | 11 | 0 | 0 | 18 |
H-Index | 6 | 0 | 0 | 6 |
i10-Index | 4 | 0 | 0 | 4 |
G-Index | 6 | 0 | 0 | 1 |
List of Articles
No | Title | Publication | Date | Type | URL | |
---|---|---|---|---|---|---|
1 | Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity | MATEC Web of Conferences | 12 September 2018 | Conference Proceedin |
|
|
2 | Negative total float to improve a multi-objective integer non-linear programming for project scheduling compression | International Journal of Electrical and Computer Engineering | 1 Desember 2018 | Journal |
|
|
3 | Numerical simulations of tsunami waves impacts on Ulee Lheue Harbour in Banda Aceh-Indonesia | IOP Conference Series: Earth and Environmental Science | 1 March 2017 | Conference Proceedin |
|
|
4 | The weights detection of multi-criteria by using Solver | International Journal of Electrical and Computer Engineering | 1 January 2017 | Journal |
|
|
5 | The subcontractor selection practice using ANN-multilayer | International Journal of Technology | 31 July 2017 | Journal |
|
|
6 | Practical crash duration estimation for project schedule activities | Journal of King Saud University - Engineering Sciences | 1 January 2021 | Journal |
|
|
7 | Predicting red clay swelling behaviour of Jangka Buya - Pidie Jaya earthquake zone in Aceh | AIP Conference Proceedings | 11 January 2019 | Conference Proceedin |
|
|
8 | Implementing Fuzzy TOPSIS on Project Risk Variable Ranking | Advances in Civil Engineering | 1 January 2019 | Journal |
|
|
9 | The end user requirement for project management software accuracy | International Journal of Electrical and Computer Engineering | 1 April 2018 | Journal |
|
|
10 | Comparative Study on the Cost of Building Public House Construction Using Red Brick and Interlock Brick Building Material in the City of Banda Aceh | IOP Conference Series: Materials Science and Engineering | 11 May 2018 | Conference Proceedin |
|
|
11 | Identifying inaccuracy of MS Project using system analysis | IOP Conference Series: Materials Science and Engineering | 11 May 2018 | Conference Proceedin |
|
|
12 | Project risk patterns: A comparison across three periods | International Journal on Advanced Science, Engineering and Information Technology | 1 January 2018 | Journal |
|
|
13 | Neural Network for the Standard Unit Price of the Building Area | Procedia Engineering | 1 January 2017 | Conference Proceedin |
|
|
No | Title | Publisher | Source | Date | url |
---|
No | Title | Publication | Year | url | |
---|---|---|---|---|---|
1 | Tingkat Kepuasan Pemilik Rumah Bantuan Pasca Bencana Gempa di Kabupaten Pidie Jaya dengan Rekonstruksi Berbasis Masyarakat | Journal of The Civil Engineering Student 5 (1), 43-49, 2023 | 2023 |
|
|
2 | Aplikasi Artificial Neural Network (ANN) pada Model Prediksi Kuat Tarik Belah Beton Busa | Journal of The Civil Engineering Student 4 (1), 29-35, 2022 | 2022 |
|
|
3 | Strategi Pengembangan Sarana dan Prasarana Ekowisata Krueng Jalin Kota Jantho | Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (2), 119-128, 2022 | 2022 |
|
|
4 | Kajian Identifikasi Risiko Terhadap Perusahaan Asphalt Mixing Plant (AMP) Yang Berada di Wilayah Banda Aceh dan Aceh Besar | Journal of The Civil Engineering Student 4 (2), 127-133, 2022 | 2022 |
|
|
5 | Pengaruh Pembiayaan Murabahah, Mudharabah, dan Musyarakah terhadap Profitabilitas pada PT Bank BNI Syariah | Jurnal Akuntansi Indonesia 9 (2), 168-181, 2021 | 2021 |
|
|
6 | Prediksi Kuat Tekan Beton Kinerja Tinggi dengan Pemodelan Metode Artificial Neural Network (ANN) | Jurnal Teknik Sipil 10 (2), 106-113, 2021 | 2021 |
|
|
7 | Model Time-Cost Trade-Off pada Pekerjaan Tangga Beton Di Banda Aceh | Journal of The Civil Engineering Student 3 (1), 42, 2021 | 2021 |
|
|
8 | Model Hubungan Pertukaran Waktu dan Biaya pada Pekerjaan Rangka Atap di Kabupaten Pidie | Journal of The Civil Engineering Student 2 (2), 204-210, 2020 | 2020 |
|
|
9 | Hard bearing layers identification of escape hill design for facing tsunami-earthquake disaster at Deah Baroe rural area for natural disaster risk reduction | IOP Conference Series: Materials Science and Engineering 933 (1), 012039, 2020 | 2020 |
|
|
10 | Model Hubungan Pertukaran Waktu dan Biaya pada Rangka Plafon di Kabupaten Aceh Barat Daya | Journal of The Civil Engineering Student 2 (2), 197-203, 2020 | 2020 |
|
|
11 | Penerapan Metode Lzw dan Zero Compression Untuk Mengkompresi File Text | Journal of Computer System and Informatics (JoSYC) 1 (3), 178-183, 2020 | 2020 |
|
|
12 | Predicting red clay swelling behaviour of Jangka Buya–Pidie Jaya earthquake zone in Aceh | AIP Conference Proceedings 2059 (1), 2019 | 2019 |
|
|
13 | Implementing fuzzy TOPSIS on project risk variable ranking | Advances in Civil Engineering 2019, 2019 | 2019 |
|
|
14 | Sub-activity Time-Cost Trade-off Model of Building Structural Beam on the Projects in the North Aceh Region | Aceh International Journal of Science and Technology 8 (2), 86-94, 2019 | 2019 |
|
|
15 | The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality | Aceh International Journal of Science and Technology 8 (2), 106-113, 2019 | 2019 |
|
|
16 | Preservation Of Status Quo Or Inter-Ethnicity Relation The Dynamics of Malay-Chinese Economic Relation in the Northern Coast Area of West Kalimantan | I-ECONOMICS: A Research Journal on Islamic Economics 5 (1), 17-36, 2019 | 2019 |
|
|
17 | Model Hubungan Waktu dan Biaya untuk Pekerjaan Pasangan Dinding Bata di Kabupaten Bireuen | Journal of The Civil Engineering Student 1 (3), 71-75, 2019 | 2019 |
|
|
18 | Model Time-Cost Trade Off untuk Pekerjaan Kolom Utama di Kabupaten Aceh Selatan | Journal of The Civil Engineering Student 1 (3), 98-104, 2019 | 2019 |
|
|
19 | SISTEM INFORMASI PENGADUAN ATM BANK DI ACEH | Sisfo: Jurnal Ilmiah Sistem Informasi 3 (1), 2019 | 2019 |
|
|
20 | Research Article Implementing Fuzzy TOPSIS on Project Risk Variable Ranking | 2019 |
|
|
|
21 | The End User Requirement for Project Management Software Accuracy | International Journal of Electrical and Computer Engineering 8 (2), 1112-1121, 2018 | 2018 |
|
|
22 | Implementasi Pendukung Keputusan Dalam Pemilihan Calon Peserta Cerdas Cermat Tingkat SMA Menerapkan Metode VIKOR | Jurikom (jurnal riset komputer) 5 (2), 109-113, 2018 | 2018 |
|
|
23 | Project risk patterns: a comparison across three periods | International Journal on Advanced Science, Engineering and Information …, 2018 | 2018 |
|
|
24 | Time-cost trade-off model for tie beam activity | Jurnal Teknik Sipil 7 (1), 9-15, 2018 | 2018 |
|
|
25 | Identifying inaccuracy of MS Project using system analysis | IOP Conference Series: Materials Science and Engineering 352 (1), 012036, 2018 | 2018 |
|
|
26 | Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity | MATEC Web of Conferences 197, 10004, 2018 | 2018 |
|
|
27 | Negative total float to improve a multi-objective integer non-linear programming for project scheduling compression | International Journal of Electrical and Computer Engineering (IJECE) 8 (6Â …, 2018 | 2018 |
|
|
28 | Neural Network for the Standard Unit Price of the Building Area | Procedia Engineering 171, 282-293, 2017 | 2017 |
|
|
29 | The subcontractor selection practice using ANN-multilayer | International Journal of Technology 8 (4), pp. 761-772, 2017 | 2017 |
|
|
30 | The weights detection of Multi-criteria by using Solver | International Journal of Electrical and Computer Engineering (IJECE) 7 (2Â …, 2017 | 2017 |
|
|
31 | Study of Unit Price for Competitive Bidding Based on CCI (Construction Cost Index) for Building | International Journal of Engineering Research and 5 (01), 148, 2016 | 2016 |
|
|
32 | Aplikasi software winest terhadap perhitungan rencana anggaran biaya (studi kasus pembuatan jaringan irigasi Meudang Ara Kecamatan Syamtalira Bayu Kabupaten Aceh Utara) | Jurnal Teknik Sipil 4 (3), 323-332, 2015 | 2015 |
|
|
33 | Redesain Pelabuhan Balohan Sebagai Landmark Baru Kota Wisata Pulau Weh | Jurnal Sains dan Seni ITS 3 (1), G4-G8, 2014 | 2014 |
|
|
List of Research Works
No | Title | Focus | Scheme | Year |
---|
List of Community Services
No | Title | Focus | Scheme | Year |
---|
List of IPRs
No | Title | Publication Date | Category | Request Number |
---|
List of Books
No | Title | Publisher | Place | Category | ISBN | Year | |
---|---|---|---|---|---|---|---|
1 | Microsoft Project 2010: Bahas Tuntas Dengan Ribbon | deepublish | Yogyakarta | 9786024537258 | 2018 |
|