Dr. ANITA RAUZANA, S.T, M.T
S2 - Teknik Sipil
SINTA Score Overall
631
SINTA Score 3Year
326
Affiliation Score Overall
25.447.400
Affiliation Score 3Year
3.500.040
Authors Publication
Database Author
| Scopus | WOS | Garuda | GS | |
|---|---|---|---|---|
| Article | 8 | 0 | 19 | 61 |
| Citation | 28 | 0 | 0 | 265 |
| Cited Document | 6 | 0 | 0 | 35 |
| H-Index | 4 | 0 | 0 | 9 |
| i10-Index | 1 | 0 | 0 | 7 |
| G-Index | 1 | 0 | 0 | 1 |
List of Articles
| No | Title | Publication | Date | Type | URL | |
|---|---|---|---|---|---|---|
| 1 | Causes of delays in construction projects in the Province of Aceh, Indonesia | PLoS ONE | 1 January 2022 | Journal |
|
|
| 2 | The effectiveness of on-line learning at an Indonesian university during the Covid-19 pandemic: students' perspectives | World Transactions on Engineering and Technology Education | 1 January 2022 | Journal |
|
|
| 3 | The correlation of financial risk variables on project construction budget infrastructure in Aceh | AIP Conference Proceedings | 25 July 2022 | Conference Proceedin |
|
|
| 4 | Critical delay factors for construction projects in Central Aceh District, Indonesia | F1000Research | 1 January 2022 | Journal |
|
|
| 5 | The influence of project manager competencies on the success of construction projects: A case of Indonesia | Problems and Perspectives in Management | 1 January 2022 | Journal |
|
|
| 6 | A Study on Drinking Water Distribution Project in Banda Aceh | Journal of Physics: Conference Series | 18 June 2021 | Conference Proceedin |
|
|
| 7 | The knowledge and awareness of occupational health and safety requirements among civil engineering students in an Indonesian university | Global Journal of Engineering Education | 1 January 2021 | Journal |
|
|
| 8 | The effect of the risk factors on the performance of contractors in Banda Aceh, indonesia | ARPN Journal of Engineering and Applied Sciences | 1 January 2016 | Journal |
|
|
| No | Title | Publication | Date | Type | url |
|---|
| No | Title | Publisher | Source | Date | url | |
|---|---|---|---|---|---|---|
| 1 | Sosialisasi Mitigasi Kebencanaan Berbasis Masyarakat Di Desa Peunayong | Asosiasi Dosen Akuntansi Indonesia | COMSEP: Jurnal Pengabdian Kepada Masyarakat | 2 February 2022 |
|
|
| 2 | Public Perception of Tiro Reservoir Development in Blang Rukui Village, Tiro District, Pidie Regency | Direktorat Penelitian dan Pengabdian Kepada Masyarakat | Jurnal Dedikasi | 8 June 2021 |
|
|
| 3 | IDENTIFIKASI RISIKO BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG BAGI PERUSAHAAN KONTRAKTOR | Universitas Teuku Umar | Jurnal Teknik Sipil dan Teknologi Konstruksi | 28 October 2022 |
|
|
| 4 | Analisis Hubungan Penerapan Green Construction terhadap Biaya oleh Konsultan Pengawas di Kota Banda Aceh | Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang | Media Teknik Sipil | 21 May 2021 |
|
|
| 5 | Perception Analysis of Green Construction Implementation on Construction Projects For Contractors in Banda Aceh City | Universitas Islam Negeri Ar-Raniry Banda Aceh | Elkawnie: Journal of Islamic Science and Technology | 17 January 2022 |
|
|
| 6 | IDENTIFIKASI FAKTORâÂÂFAKTOR UTAMA PENYEBAB TERJADINYA KETERLAMBATAN WAKTU PENYELESAIAN PADA PEKERJAAN INFRASTRUKTUR GEDUNG DI BANDA ACEH | Prodi Magister Teknik Sipil Unsyiah | Jurnal Arsip Rekayasa Sipil dan Perencanaan | 27 April 2020 |
|
|
| 7 | Kajian Faktor-Faktor Penyebab Rendahnya Kinerja Mutu pada Proyek Konstruksi di Provinsi Aceh | Department of Civil Engineering, Diponegoro University | MEDIA KOMUNIKASI TEKNIK SIPIL | 2 February 2021 |
|
|
| 8 | PEMBINAAN MANAJEMEN KEUANGAN BAGI PEKERJA KERAJINAN SOUVENIR ACEH DI KOTA BANDA ACEH | Lembaga Penelitian dan Pengabdian Masyarakat (LP2M), Universitas Negeri Semarang | Jurnal Abdimas | 1 Desember 2020 |
|
|
| 9 | PEMBINAAN MANAJEMEN KEUANGAN BAGI PEKERJA KERAJINAN SOUVENIR ACEH DI KOTA BANDA ACEH | Universitas Negeri Semarang | Jurnal Abdimas | 1 Desember 2020 |
|
|
| 10 | IDENTIFIKASI FAKTOR KINERJA KONTRAKTOR YANG PALING BERPENGARUH TERHADAP KEPUASAN STAKEHOLDERS DI DINAS CIPTA KARYA ACEH | Prodi Magister Teknik Sipil Unsyiah | Jurnal Arsip Rekayasa Sipil dan Perencanaan | 20 September 2019 |
|
|
| 11 | FAKTOR-FAKTOR PENERAPAN KESELAMATAN DAN KESEHATAN KERJA YANG MEMPENGARUHI KINERJA PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH | Prodi Magister Teknik Sipil Unsyiah | Jurnal Arsip Rekayasa Sipil dan Perencanaan | 9 Desember 2018 |
|
|
| 12 | FAKTOR SISA MATERIAL YANG MEMPENGARUHI BIAYA PADA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH | Prodi Magister Teknik Sipil Unsyiah | Jurnal Arsip Rekayasa Sipil dan Perencanaan | 9 Desember 2018 |
|
|
| 13 | FAKTOR-FAKTOR RISIKO WAKTU YANG MEMPENGARUHI BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH | Prodi Magister Teknik Sipil Unsyiah | Jurnal Arsip Rekayasa Sipil dan Perencanaan | 9 Desember 2018 |
|
|
| 14 | ANALISIS FAKTOR-FAKTOR PENERAPAN PENGADAAN BARANG/JASA PEMERINTAH SECARA E-PROCUREMENT TERHADAP PENYERAPAN ANGGARAN DI KOTA SABANG | Prodi Magister Teknik Sipil Unsyiah | Jurnal Arsip Rekayasa Sipil dan Perencanaan | 2 April 2018 |
|
|
| 15 | PEMBINAAN STASIUN KERJA YANG ERGONOMIS BAGI PEKERJA KERAJINAN SOUVENIR ACEH DI KOTA BANDA ACEH | Lembaga Penelitian dan Pengabdian Masyarakat (LP2M), Universitas Negeri Semarang | Jurnal Abdimas | 11 Desember 2017 |
|
|
| 16 | ANALISIS PENGARUH FAKTOR-FAKTOR KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI SUNGAI PADA DINAS PENGAIRAN ACEH | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 15 May 2017 |
|
|
| 17 | ANALISIS FAKTOR-FAKTOR PEMBENGKAKAN BIAYA (COST OVERRUN) YANG BERPENGARUH TERHADAP KETIDAKPASTIAN BIAYA (CONTINGENCY COST) PADA PROYEK IRIGASI DI KABUPATEN ACEH BESAR | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 15 Desember 2017 |
|
|
| 18 | ANALISIS FAKTOR-FAKTOR PENGARUH KONFLIK (DISPUTE) TERHADAP KEBERHASILAN PROYEK KONSTRUKSI DI PROVINSI ACEH | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 30 October 2017 |
|
|
| 19 | ANALISIS FAKTOR-FAKTOR PENGHAMBAT YANG BERPENGARUH TERHADAP WAKTU PROYEK IRIGASI DI PROVINSI ACEH | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 15 May 2016 |
|
|
| No | Title | Publication | Year | url | |
|---|---|---|---|---|---|
| 1 | Causes of Obstacles in the Implementation of Construction Projects | International Journal of Scientific Research and Engineering Development 6Â …, 2023 | 2023 |
|
|
| 2 | Analisis Risiko Keterlambatan Proyek Di Kabupaten Aceh Tengah | Journal of The Civil Engineering Student 5 (1), 99-105, 2023 | 2023 |
|
|
| 3 | Analysis of Causes of Human Errors in Construction Projects | International Journal of Scientific Research and Engineering Development- 6Â …, 2023 | 2023 |
|
|
| 4 | Effect of LSMC Implementation on Contractor Performance for National Road Construction In Aceh, Indonesia | Apollo: Journal of Tourism and Business 1 (3), 93-96, 2023 | 2023 |
|
|
| 5 | Relationship between occupational health and safety on construction project performance | AIP Conference Proceedings 2798 (1), 2023 | 2023 |
|
|
| 6 | Study on the implementation of the reservoir project in Pidie district | AIP Conference Proceedings 2798 (1), 2023 | 2023 |
|
|
| 7 | Perception Analysis of Green Construction Implementation on Construction Projects For Contractors in Banda Aceh City | Elkawnie: Journal of Islamic Science and Technology 7 (2), 239-251, 2022 | 2022 |
|
|
| 8 | Causes of delays in construction projects in the Province of Aceh, Indonesia | PloS one 17 (1), e0263337, 2022 | 2022 |
|
|
| 9 | Sosialisasi mitigasi kebencanaan berbasis masyarakat di desa Peunayong | COMSEP: Jurnal Pengabdian Kepada Masyarakat 3 (1), 119-124, 2022 | 2022 |
|
|
| 10 | Critical delay factors for construction projects in Central Aceh District, Indonesia | F1000Research 11, 2022 | 2022 |
|
|
| 11 | The correlation of financial risk variables on project construction budget infrastructure in Aceh | AIP Conference Proceedings 2453 (1), 2022 | 2022 |
|
|
| 12 | The effectiveness of on-line learning at an Indonesian university during the Covid-19 pandemic: students’ perspectives | World Transactions on Engineering and Technology Education 20 (1), 71-75, 2022 | 2022 |
|
|
| 13 | Critical delay factors for construction projects in Central Ace h District, Indonesia [version 1; peer review: 1 not approved] | 2022 |
|
|
|
| 14 | Konservasi Penyu Di Pantai Pasi Jalang, Lhoknga, Kabupaten Aceh Besar | COMSEP: Jurnal Pengabdian Kepada Masyarakat 3 (3), 266-272, 2022 | 2022 |
|
|
| 15 | THE INFLuENCE OF PROJECT MANAGER COMPETENCIES ON THE SuCCESS OF CONSTRuCTION PROJECTS: A CASE OF INDONESIA | ResearchGate 20 (3), 67-75, 2022 | 2022 |
|
|
| 16 | IDENTIFIKASI RISIKO BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG BAGI PERUSAHAAN KONTRAKTOR | Jurnal Teknik Sipil dan Teknologi Konstruksi 8 (2), 121-132, 2022 | 2022 |
|
|
| 17 | Factors Causing Cost Overruns In Construction Projects | International Journal of Engineering Technologies and Management Research 9Â …, 2022 | 2022 |
|
|
| 18 | ANALISIS FAKTOR-FAKTOR RISIKO YANG MEMPENGARUHI MUTU PADA PROYEK KONSTRUKSI DI ACEH UTARA | TERAS JURNAL: Jurnal Teknik Sipil 11 (1), 223-232, 2021 | 2021 |
|
|
| 19 | Feasibility Analysis of the Development of Tiro Reservoir in Blang Rukui Village, Tiro District, Pidie Regency | Jurnal Dedikasi 18 (1), 9-20 | 2021 |
|
|
| 20 | A Study on drinking water distribution project in Banda Aceh | Journal of Physics: Conference Series 1933 (1), 012091, 2021 | 2021 |
|
|
| 21 | Analisis Hubungan Penerapan Green Construction Terhadap Biaya oleh Konsultan Pengawas di Kota Banda Aceh | Media Teknik Sipil 19 (1), 1-9, 2021 | 2021 |
|
|
| 22 | Pengembangan Motif Aceh dan Penataan Ruang Kerja Bagi Pengrajin Souvenir | COMSEP: Jurnal Pengabdian Kepada Masyarakat 2 (2), 168-177, 2021 | 2021 |
|
|
| 23 | The knowledge and awareness of occupational health and safety requirements among civil engineering students in an Indonesian university | Global Journal of Engineering Education 23 (3), 210-215, 2021 | 2021 |
|
|
| 24 | Public Perception of Tiro Reservoir Development in Blang Rukui Village, Tiro District, Pidie Regency | Jurnal Dedikasi 18 (1), 9-20, 2021 | 2021 |
|
|
| 25 | Perception Analysis of Green Construction Implementation on Construction Projects For Contractors in Banda Aceh City | Perception 7 (2), 2021 | 2021 |
|
|
| 26 | IDENTIFIKASI FAKTOR–FAKTOR UTAMA PENYEBAB TERJADINYA KETERLAMBATAN PADA PELAKSANAAN YANG MEMPENGARUHI WAKTU PENYELESAIAN PEKERJAAN INFRASTRUKTUR GEDUNG DI KOTA BANDA ACEH | Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil … | 2020 |
|
|
| 27 | IDENTIFIKASI FAKTOR–FAKTOR UTAMA PENYEBAB TERJADINYA KETERLAMBATAN WAKTU PENYELESAIAN PADA PEKERJAAN INFRASTRUKTUR GEDUNG DI BANDA ACEH | Jurnal Arsip Rekayasa Sipil dan Perencanaan 3 (1), 70-79, 2020 | 2020 |
|
|
| 28 | The Impact of Green Construction Factors on Project Cost | International Journal of Scientific Research and Engineering Development 3Â …, 2020 | 2020 |
|
|
| 29 | Pembinaan Manajemen Keuangan Bagi Pekerja Kerajinan Souvenir Aceh di Kota Banda Aceh | Jurnal Abdimas 24 (3), 209-214, 2020 | 2020 |
|
|
| 30 | The Impact of Green Construction Factors on Project Cost in Banda Aceh | Int. J. Sci. Res. Eng. Dev 3, 2020 | 2020 |
|
|
| 31 | Kajian faktor-faktor penyebab rendahnya kinerja mutu pada proyek konstruksi di Provinsi Aceh | Media Komunikasi Teknik Sipil 26 (2), 267-274, 2020 | 2020 |
|
|
| 32 | Identifikasi Faktor Kinerja Kontraktor Yang Paling Berpengaruh Terhadap Kepuasan Stakeholders Di Dinas Cipta Karya Aceh | Jurnal Arsip Rekayasa Sipil dan Perencanaan 2 (3), 268-275, 2019 | 2019 |
|
|
| 33 | ANALISIS FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI PALING DOMINAN DI KABUPATEN ACEH UTARA | Teras Jurnal 9 (2), 145-152, 2019 | 2019 |
|
|
| 34 | Causes of Claims in the Construction Project | International Journal of Scientific Research and Engineering Development 2Â …, 2019 | 2019 |
|
|
| 35 | Identification of Green Construction Factors in Construction Projects | International Journal of Scientific Research and Engineering Development 2Â …, 2019 | 2019 |
|
|
| 36 | The effectiveness of on-line learning at an Indonesian university during the Covid-19 pandemic: students’ perspectives | Civil Engineering 77 (60), 137, 2019 | 2019 |
|
|
| 37 | FAKTOR-FAKTOR RISIKO WAKTU YANG MEMPENGARUHI BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH | Jurnal Arsip Rekayasa Sipil dan Perencanaan 1 (4), 156-163, 2018 | 2018 |
|
|
| 38 | Faktor Sisa Material yang Mempengaruhi Biaya Pada Pelaksanaan Proyek Konstruksi Gedung di Provinsi Aceh | Jurnal Arsip Rekayasa Sipil dan Perencanaan 1 (4), 148-155, 2018 | 2018 |
|
|
| 39 | Uncertainty Variables on Cost Estimation in Project Construction | IOSR Journal of Business and Management 20 (1), 80-86, 2018 | 2018 |
|
|
| 40 | FAKTOR-FAKTOR PENERAPAN KESELAMATAN DAN KESEHATAN KERJA YANG MEMPENGARUHI KINERJA PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH | Jurnal Arsip Rekayasa Sipil dan Perencanaan 1 (4), 130-137, 2018 | 2018 |
|
|
| 41 | ANALISIS FAKTOR-FAKTOR PENERAPAN PENGADAAN BARANG/JASA PEMERINTAH SECARA E-PROCUREMENT TERHADAP PENYERAPAN ANGGARAN DI KOTA SABANG | Jurnal Arsip Rekayasa Sipil dan Perencanaan 1 (1), 151-160, 2018 | 2018 |
|
|
| 42 | Critical Factors Affecting Quality Performance in Construction Projects | International Journal of Management and Administrative Sciences (IJMAS ) 6Â …, 2018 | 2018 |
|
|
| 43 | Analisis Faktor-faktor Pengaruh Konflik (Dispute) Terhadap Keberhasilan Proyek Konstruksi di Provinsi Aceh | Jurnal Teknik Sipil 6 (2), 149-158, 2017 | 2017 |
|
|
| 44 | PEMBINAAN STASIUN KERJA YANG ERGONOMIS BAGI PEKERJA KERAJINAN SOUVENIR ACEH DI KOTA BANDA ACEH | Jurnal Abdimas 21 (2), 145-152, 2017 | 2017 |
|
|
| 45 | Analisis Faktor-Faktor Pembengkakan Biaya (Cost Overrun) yang Berpengaruh Terhadap Ketidakpastian Biaya (Contingency Cost) Pada Proyek Irigasi di Kabupaten Aceh Besar | Jurnal Teknik Sipil 1 (2), 317-328, 2017 | 2017 |
|
|
| 46 | Analisis Pengaruh Faktor-Faktor Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Sungai Pada Dinas Pengairan Aceh | Jurnal Teknik Sipil 6 (3), 317-328, 2017 | 2017 |
|
|
| 47 | Implementation of Quality Management System in Construction | American journal of Engineering Research (AJER) 6 (12), 173-179, 2017 | 2017 |
|
|
| 48 | Analisis Faktor-Faktor Penghambat Yang Berpengaruh Terhadap Waktu Proyek Irigasi Di Provinsi Aceh | Jurnal Teknik Sipil 5 (3), 259-268, 2016 | 2016 |
|
|
| 49 | Analysis of Causes of Delay and Time Performance in Construction Projects | IOSR Journal of Mechanical and Civil Engineering 13 (5), 116-121, 2016 | 2016 |
|
|
| 50 | Causes of Conflicts and Disputes in Construction Projects | IOSR Journal of Mechanical and Civil Engineering 13 (5), 44-48, 2016 | 2016 |
|
|
| 51 | Cost Overruns and Failure in Construction Projects | IOSR Journal of Business and Management 18 (10), 80-83, 2016 | 2016 |
|
|
| 52 | The effect of the risk factors on the performance of contractors in Banda Aceh, Indonesia | ARPN Journal of Engineering and Applied Sciences 11 (15), 9496-9502, 2016 | 2016 |
|
|
| 53 | Identification and Assessment of Risk Factors Affecting Construction Projects in North Aceh, Indonesia | IOSR Journal of Business and Management 18 (9), 72-77, 2016 | 2016 |
|
|
| 54 | Analysis of Causg of Delay and Time Performance in Construction Projects. IOSR | Journal of Mechanical and Civil Engineering (IOSR-JMCE) 13 (5), 2016 | 2016 |
|
|
| 55 | The Influence of Uncertainty Variables on Cost Estimation Lesson Learned From Construction Industry in Indonesia | Australian Journal of Basic and Applied Sciences 9 (7), 380-385, 2015 | 2015 |
|
|
| 56 | The Correlation of Uncertainty Variables on Project Time Estimation in Banda Aceh, Indonesia | Australian Journal of Basic and Applied Sciences 9 (31), 308-311, 2015 | 2015 |
|
|
| 57 | The Influence of Uncertainty Variables of project time in Construction Industry In Banda Aceh, Indonesia | Australian Journal of Basic and Applied Sciences 9 (31), 304-307, 2015 | 2015 |
|
|
| 58 | The Impact of Uncertainty Variableson Contingency Cost | Australian Journal of Basic and Applied Sciences 9 (7), 279-283, 2015 | 2015 |
|
|
| 59 | Frequency Analysis of Genesis Risk In Construction Projects | IOSR Journal of Mechanical and Civil Engineering 5 (6), 45-51, 2013 | 2013 |
|
|
| 60 | Modeling and simulation of fuzzy logic controller-based model reference adaptive controller | International Journal of Innovative Computing, Information and Control 8 (4Â … | 2012 |
|
|
| 61 | Analysis of Direct Budget Implementation Building Construction Work | IOSR Journal of Mechanical and Civil Engineering 4 (4), 43-48, 2012 | 2012 |
|
|
| 62 | Homeostatic turnover of virus-specific memory CD8 T cells occurs stochastically and is independent of CD4 T cell help | The Journal of Immunology 185 (6), 3436-3444 | 2010 |
|
|
| 63 | Critical Factors Affecting Quality Performance in Construction Projects |
|
|
||
| 64 | Risk Assessment of Construction Project Cost in Banda Aceh, Indonesia |
|
|
||
| 65 | The Impact of Green Construction Factors on Project Cost in Banda Aceh |
|
|
||
| 66 | Kajian Faktor-Faktor Penyebab Rendahnya Kinerja Mutu pada Proyek Konstruksi di Provinsi Aceh |
|
|
||
| 67 | Factors Influencing Cost Overruns in Construction Projects in Banda Aceh, Indonesia |
|
|
||
| 68 | The Impact of Green Construction Factors on Project Cost in Banda Aceh |
|
|
||
| 69 | Factors Influencing Cost Overruns in Construction Projects in Banda Aceh, Indonesia |
|
|
||
| 70 | Risk Assessment of Construction Project Cost in Banda Aceh, Indonesia |
|
|
||
| 71 | Sosialisasi Mitigasi Kebencanaan Berbasis Masyarakat Di Desa Peunayong |
|
|
||
| 72 | Masimin, & Anita Rauzana.(2017). Analisis Faktor-Faktor Pembengkakan Biaya (Cost Overrun) Yang Berpengaruh Terhadap Ketidakpastian Biaya (Contingency Cost) Pada Proyek Irigasi … | Jurnal Teknik Sipil Universitas Syiah Kuala 1, 317-328, 0 |
|
|
|
| 73 | Analysis of Causes of Human Errors in Construction Projects |
|
|
List of Research Works
| No | Title | Focus | Scheme | Year | |
|---|---|---|---|---|---|
| 1 | DEVELOPING KNOWLEDGE MANAGEMENT BASED DISASTER EDUCATION MODEL IN ENHANCING COMMUNITY RESILIENCE | KESEHATAN DAN OBAT-OBATAN | PENELITIAN BERBASIS H-INDEKS | 2021 |
|
| 2 | MITIGASI RISIKO BENCANA PEMANASAN GLOBAL MELALUI ANALISIS KINERJA MUTU GREEN CONSTRUCTION PADA PROYEK KONSTRUKSI DI KOTA BANDA ACEH | Kebencanaan | Penelitian Dasar | 2020 |
|
| 3 | ANALYSIS OF STRATEGIC PRIORITIES TO IMPLEMENT KNOWLEDGE CREATION MODEL IN ENHANCING COMMUNITY RESILIENCE TOWARDS COASTAL HAZARDS USING ANALYTICAL NETWORK PROCESS | KESEHATAN DAN OBAT-OBATAN | PENELITIAN BERBASIS H-INDEKS | 2020 |
|
| 4 | MITIGASI RISIKO BENCANA PEMANASAN GLOBAL MELALUI ANALISIS KINERJA MUTU GREEN CONSTRUCTION PADA PROYEK KONSTRUKSI DI KOTA BANDA ACEH | Kebencanaan | Penelitian Dasar | 2019 |
|
List of Community Services
| No | Title | Focus | Scheme | Year |
|---|
List of IPRs
| No | Title | Publication Date | Category | Request Number | |
|---|---|---|---|---|---|
| 1 | Perencanaan Stasiun Kerja Sesuai dengan Karakter Pekerja, Kapasitas, Alat dan Ruang serta Lingkungan Kerja | 24 January 2023 | hak cipta | EC00202307084 |
|
| 2 | Risiko Dan Ketidakpastian Pada Proyek Konstruksi | 22 August 2022 | hak cipta | EC00202256228 |
|
| 3 | Manajemen Proyek | 22 August 2022 | hak cipta | EC00202256230 |
|
List of Books
| No | Title | Publisher | Place | Category | ISBN | Year | |
|---|---|---|---|---|---|---|---|
| 1 | Pemodelan informasi bangunan (bim) | Bandar Publishing | Banda Aceh | lainnya | 9786234491463 | 2022 |
|
| 2 | Manajemen risiko proyek | Bandar Publishing | Banda Aceh | buku ajar | 9786234490787 | 2022 |
|
| 3 | Material waste pada pelaksanaan proyek konstruksi | Deepublish | Banda Aceh | buku referensi | 9786230253546 | 2022 |
|
| 4 | Risiko dan ketidakpastian pada proyek konstruksi | PT. Intan Jaya Bumi Persada | Banda Aceh | buku ajar | 9786027357327 | 2017 |
|
| 5 | Manajemen proyek | PT. Intan Jaya Bumi Persada | Banda Aceh | buku ajar | 9786027357310 | 2016 |
|
| 6 | Ekonomi rekayasa | PT. Intan Jaya Bumi Persada | Banda Aceh | buku ajar | 9786027357303 | 2015 |
|