NURISRA, S.T, M.T, M.T
D3 - Teknik Sipil
image
image
image
image
SINTA Score Overall
112
SINTA Score 3Year
12
Affiliation Score Overall
19.004.100
Affiliation Score 3Year
5.675.120

Authors Publication

Database Author

Scopus WOS Garuda GS
Article 2 2 0 22
Citation 7 3 0 195
Cited Document 2 2 0 8
H-Index 1 1 0 3
i10-Index 0 0 0 1
G-Index 0 0 0 1
List of Articles
No Title Publication Date Type URL
1 The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam IOP Conference Series: Materials Science and Engineering 11 May 2018 Conference Proceedin
URL
View
2 The main factor affecting the competitiveness of Contractor Company IOP Conference Series: Materials Science and Engineering 11 May 2018 Conference Proceedin
URL
View
No Title Publication Date Type url
1 The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam 7TH AIC-ICMR ON SCIENCES AND ENGINEERING 2017 2018 Book in series
URL
View
2 The main factor affecting the competitiveness of Contractor Company 7TH AIC-ICMR ON SCIENCES AND ENGINEERING 2017 2018 Book in series
URL
View
No Title Publisher Source Date url
No Title Publication Year url
1 Kajian Identifikasi Risiko Terhadap Perusahaan Asphalt Mixing Plant (AMP) Yang Berada di Wilayah Banda Aceh dan Aceh Besar Journal of The Civil Engineering Student 4 (2), 127-133, 2022 2022
URL
View
2 Risiko Pada Tahap Persiapan Proyek Pembangunan Irigasi Berbasis Masyarakat Di Aceh Besar Journal of The Civil Engineering Student 4 (1), 57-63, 2022 2022
URL
View
3 Analisis Faktor-Faktor Risiko Terhadap Mutu Pelaksanaan Pembangunan Irigasi Desa di Kabupaten Aceh Besar Journal of The Civil Engineering Student 4 (3), 295-301, 2022 2022
URL
View
4 Penyebab Gugurnya Penawaran Kontraktor dalam Proses Lelang ditinjau dari Aspek Teknis di Kota Banda Aceh Journal of The Civil Engineering Student 3 (2), 162-168, 2021 2021
URL
View
5 Komposisi Biaya Sumber Daya Material dan Tenaga Kerja Pada Proyek Konstruksi Bangunan Gedung Sederhana Journal of The Civil Engineering Student 3 (2), 148-154, 2021 2021
URL
View
6 Perencanaan Kebutuhan Jadwal Tenaga Kerja Pada Proyek Pembangunan Komplek Perumahan Menara Utama Di Aceh Selatan Journal of The Civil Engineering Student 3 (3), 253-259, 2021 2021
URL
View
7 TINGKAT RISIKO KONSTRUKSI DARI FAKTOR TENAGA KERJA, MATERIAL DAN PERALATAN PADA REKONSTRUKSI RUMAH PASCA BENCANA GEMPA DI KABUPATEN PIDIE JAYA Journal of The Civil Engineering Student 3 (3), 274-281, 2021 2021
URL
View
8 Kemampuan Pemasaran Dan Penawaran Sebagai Faktor Daya Saing Keunggulan Kontraktor Di Kota Banda Aceh Journal of The Civil Engineering Student 2 (1), 57-63, 2020 2020
URL
View
9 Pengaruh Peran Pemerintah dan Masyarakat Terhadap Kinerja Prakonstruksi Perumahan Pasca Bencana di Kabupaten Pidie Jaya Journal of The Civil Engineering Student 2 (2), 134-140, 2020 2020
URL
View
10 Penerapan Manajemen Proyek sebagai Faktor Daya Saing Kontraktor di Kota Banda Aceh Journal of The Civil Engineering Student 2 (1), 50-56, 2020 2020
URL
View
11 Pengaplikasian Manajemen Waktu Rekonstruksi Rumah Berbasis Masyarakat Pasca Bencana Gempa di Kabupaten Pidie Jaya Journal of The Civil Engineering Student 2 (3), 246-252, 2020 2020
URL
View
12 Proporsi Komponen Biaya Material dan Upah Tenaga Kerja pada Bangunan Gedung Tidak Sederhana di Aceh Simposium Nasional Teknik Sipil 2 (Universitas Syiah Kuala), 208-212, 2020 2020
URL
View
13 Identifikasi Kemungkinan Terjadinya Risiko Pada Kontraktor Kualifikasi Kecil dan Menengah di Kabupaten Aceh Barat Menggunakan Analysis Frequency Index Journal of The Civil Engineering Student 1 (2), 65-70, 2019 2019
URL
View
14 Esrimasi Biaya Pembangunan Perumahan Tipe 60, 100, dan 200 di Kota Banda Aceh Journal of The Civil Engineering Student 1 (2), 40-46, 2019 2019
URL
View
15 The unit price implication of reinforcement usage in tie beam reinforced concrete construction Aceh International Journal of Science and Technology 7 (1), 24-31, 2018 2018
URL
View
16 The main factor affecting the competitiveness of Contractor Company IOP Conference Series: Materials Science and Engineering 352 (1), 012034, 2018 2018
URL
View
17 ESTIMASI KETERSEDIAAN HARI KERJA UNTUK PENJADWALAN PROYEK KONSTRUKSI Jurnal Teknik Sipil 3 (2), 113-120, 2014 2014
URL
View
18 EVALUASI KEGIATAN PEMELIHARAAN DAN PERAWATAN BANGUNAN GEDUNG NEGARA (STUDI KASUS PADA GEDUNG FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA) ETD Unsyiah 2013
URL
View
19 KAJIAN BIAYA OVERHEAD PADA PELAKSANAAN PROYEK GEDUNG DI BANDA ACEH Jurnal Teknik Sipil 2 (2), 165-172, 2013 2013
URL
View
20 PERBANDINGAN PRODUKTIVITAS EXCAVATOR PADA PEKERJAAN PASANG/SUSUN BATU GUNUNG UKURAN 5-250 KG DAN 1000-1500 KG Jurnal Teknik Sipil 1 (1), 91-100, 2011 2011
URL
View
21 PERBANDINGAN RISIKO KONTRAK LUMPSUM, UNIT PRICE DAN GABUNGAN PADA PROYEK KONSTRUKSI DI KABUPATEN BIREUEN Jurnal Teknik Sipil 1 (1), 81-90, 2011 2011
URL
View
22 Nurisra. 2014. Identifikasi Faktor-Faktor Keselamatan dan Kesehatan Kerja (K3) yang Mempengaruhi Kinerja Proyek Konstruksi Jurnal Teknik Sipil 3 (3), 218-226
URL
View
23 The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam
URL
View
24 The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam
URL
View
25 Nurisra. 2014. Identifikasi Faktor-Faktor Keselamatan dan Kesehatan Kerja (K3) yang Mempengaruhi Kinerja Proyek Konstruksi Jurnal Teknik Sipil 3 (3), 218-226, 0
URL
View
List of Research Works
No Title Focus Scheme Year
1 PENGEMBANGAN MODEL ALOKASI SUMBER DAYA PADA PROYEK KONSTRUKSI ENERGI BARU DAN TERBARUKAN, MATERIAL MAJU, TEKNOLOGI INFORMASI DAN KOMUNIKASI, TRANSPORTASI PENELITIAN LEKTOR 2019 View
2 Pemodelan Standar Kebutuhan Tulangan Pada Komponen Struktural Konstruksi Bangunan Gedung Kebencanaan Penelitian Strategis Nasional Institusi 2018 View
3 Pemodelan Standar Kebutuhan Tulangan Pada Komponen Struktural Konstruksi Bangunan Gedung Kebencanaan Penelitian Produk Terapan 2017 View
4 Pengembangan Model Evaluasi Daya Saing Perusahaan Kontraktor pada Proyek Konstruksi Teknologi Informasi dan Komunikasi Penelitian Produk Terapan 2017 View
5 Pengembangan model penjadwalan proyek konstruksi dengan memperhitungkan pengaruh curah hujan Kebencanaan Penelitian Produk Terapan 2013 View
List of Community Services
No Title Focus Scheme Year
List of IPRs
No Title Publication Date Category Request Number
List of Books
No Title Publisher Place Category ISBN Year