MAHMUDDIN, S.T, M.T, M.T
S1 - Teknik Sipil
SINTA Score Overall
167
SINTA Score 3Year
58
Affiliation Score Overall
8.059.630
Affiliation Score 3Year
3.300.080
Authors Publication
Database Author
| Scopus | WOS | Garuda | GS | |
|---|---|---|---|---|
| Article | 3 | 2 | 11 | 7 |
| Citation | 11 | 3 | 0 | 13 |
| Cited Document | 3 | 2 | 0 | 4 |
| H-Index | 2 | 1 | 0 | 3 |
| i10-Index | 0 | 0 | 0 | 0 |
| G-Index | 0 | 0 | 0 | 4 |
List of Articles
| No | Title | Publication | Date | Type | URL | |
|---|---|---|---|---|---|---|
| 1 | The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam | IOP Conference Series: Materials Science and Engineering | 11 May 2018 | Conference Proceedin |
|
|
| 2 | The main factor affecting the competitiveness of Contractor Company | IOP Conference Series: Materials Science and Engineering | 11 May 2018 | Conference Proceedin |
|
|
| 3 | Project risk patterns: A comparison across three periods | International Journal on Advanced Science, Engineering and Information Technology | 1 January 2018 | Journal |
|
|
| No | Title | Publication | Date | Type | url | |
|---|---|---|---|---|---|---|
| 1 | The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam | 7TH AIC-ICMR ON SCIENCES AND ENGINEERING 2017 | 2018 | Book in series |
|
|
| 2 | The main factor affecting the competitiveness of Contractor Company | 7TH AIC-ICMR ON SCIENCES AND ENGINEERING 2017 | 2018 | Book in series |
|
|
| No | Title | Publisher | Source | Date | url | |
|---|---|---|---|---|---|---|
| 1 | Proyek Gedung BPJN Tahap I Banda Aceh ditinjau dari Sisi Penjadwalan Kebutuhan Tenaga Kerja | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | Journal of The Civil Engineering Student | 27 April 2021 |
|
|
| 2 | Analisis Biaya Pekerjaan Sloof Pada Proyek Pembangunan Gedung BPJN Aceh | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | Journal of The Civil Engineering Student | 30 August 2021 |
|
|
| 3 | Perception and Application of Environmental Management Systems in the Village of Nusa Kabupaten Aceh Besar | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | Journal of The Civil Engineering Student | 18 Desember 2020 |
|
|
| 4 | ESTIMASI KETERSEDIAAN HARI KERJA UNTUK PENJADWALAN PROYEK KONSTRUKSI | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 27 Desember 2017 |
|
|
| 5 | THE CONSIDERATION FACTORS OF WHEEL LOADER PROVISION PROCESS FOR A CONSTRUCTION PROJECT | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 30 May 2022 |
|
|
| 6 | Penyebab Gugurnya Penawaran Kontraktor dalam Proses Lelang ditinjau dari Aspek Teknis di Kota Banda Aceh | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | Journal of The Civil Engineering Student | 30 August 2021 |
|
|
| 7 | Kemampuan Pemasaran Dan Penawaran Sebagai Faktor Daya Saing Keunggulan Kontraktor Di Kota Banda Aceh | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | Journal of The Civil Engineering Student | 13 April 2020 |
|
|
| 8 | IDENTIFIKASI RISIKO PADA PROYEK PEMBANGUNAN PENGGANTIAN JEMBATAN BAJA DI ACEH JAYA DAN ACEH BESAR | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | Journal of The Civil Engineering Student | 18 Desember 2020 |
|
|
| 9 | Penerapan Manajemen Proyek sebagai Faktor Daya Saing Kontraktor di Kota Banda Aceh | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | Journal of The Civil Engineering Student | 13 April 2020 |
|
|
| 10 | TIME-COST TRADE-OFF MODEL FOR TIE BEAM ACTIVITY | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 28 May 2018 |
|
|
| 11 | PERBANDINGAN PRODUKTIVITAS EXCAVATOR PADA PEKERJAAN PASANG/SUSUN BATU GUNUNG UKURAN 5-250 KG DAN 1000-1500 KG | Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala | JURNAL TEKNIK SIPIL | 1 September 2011 |
|
|
| No | Title | Publication | Year | url | |
|---|---|---|---|---|---|
| 1 | Project risk patterns: a comparison across three periods | International Journal on Advanced Science, Engineering and Information …, 2018 | 2018 |
|
|
| 2 | Time-cost trade-off model for tie beam activity | Jurnal Teknik Sipil 7 (1), 9-15, 2018 | 2018 |
|
|
| 3 | The main factor affecting the competitiveness of Contractor Company | IOP Conference Series: Materials Science and Engineering 352 (1), 012034, 2018 | 2018 |
|
|
| 4 | ESTIMASI KETERSEDIAAN HARI KERJA UNTUK PENJADWALAN PROYEK KONSTRUKSI | Jurnal Teknik Sipil 3 (2), 113-120, 2014 | 2014 |
|
|
| 5 | Housing Rehabilitation Budget Estimate Due To Earthquake Disaster by Using Multiple Linear Regression Models | 9th Annual International Workshop and Expo on Sumatra Tsunami Disaster and …, 2014 | 2014 |
|
|
| 6 | PERBANDINGAN PRODUKTIVITAS EXCAVATOR PADA PEKERJAAN PASANG/SUSUN BATU GUNUNG UKURAN 5-250 KG DAN 1000-1500 KG | Jurnal Teknik Sipil 1 (1), 91-100, 2011 | 2011 |
|
|
| 7 | The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam |
|
|
||
| 8 | The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam |
|
|
List of Research Works
| No | Title | Focus | Scheme | Year | |
|---|---|---|---|---|---|
| 1 | Pengembangan Model Evaluasi Daya Saing Perusahaan Kontraktor pada Proyek Konstruksi | Teknologi Informasi dan Komunikasi | Penelitian Produk Terapan | 2017 |
|
List of Community Services
| No | Title | Focus | Scheme | Year |
|---|
List of IPRs
| No | Title | Publication Date | Category | Request Number |
|---|
List of Books
| No | Title | Publisher | Place | Category | ISBN | Year |
|---|